09 November 2011
The benefits of an effective storage system can never be underestimated as our customer Cost Plus Sofas discovered. They had no stock control method in operation, just simply storing boxes on the ground. This was posing detrimental effects on the quality of the stock as damages were occurring and they were unable to accurately count stock. At times forktruck access to stock was impossible and heavy manual handling was necessary. An immediate solution was required.
18 August 2011
Northern Ireland's largest third level education institution, Belfast Metropolitan College, is opening its new Titanic Quarter campus in September 2011. The new campus, which will replace the Institute's current facilities, will provide education for up to 18,000 full-time and part-time students. Sperrin Metal was the chosen supplier by the Furniture Contractor Space Contract Interiors for the lockers and library shelving for this exciting new build project.
16 August 2010
Sperrin Metal Products Ltd were awarded the contract to supply and fit new lockers in the recently refurbished locker room for Bushmills Distillery.
15 March 2010
In March 2010 Sperrin Metal was successful in securing the contract to supply and install approximately 115 Bays of Sperrin Mobile Shelving at a cost of £25,000.
08 March 2010
In March 2010 Sperrin Metal gained status as a preferred supplier to the Irish Prison Service for a four year period.
15 February 2010
In February 2010 Sperrin Metal was successful in securing the contract to supply and install approximately 200 Lockers to the new Aviva Stadium.
11 August 2008
Kelly Flowers, a leading floral wholesaler based in Lisburn had invested in a purpose built factory to display their substantial product range.
Click for further details.
Storage facility for up to 3 guns or 4 guns available. *Conditions apply*